Construction Sciences
  • Home
  • Services
      • Construction Materials Testing
      • Geotechnical Engineering
      • Environmental Consulting
      • Subsurface Utility Engineering
  • Projects
      • NorthConnex Tunnel Fitout
      • PS2 Inland Rail Narrabri to North Star
      • New Parallel Runway (NPR)
      • Toowoomba Second Range Crossing
      • Sunshine Coast Airport Expansion
      • Bruce Highway Upgrade – CR2SM
      • South Flank Bulk Earthworks
      • Mackay Ring Road (Stage 1)
  • About Us
  • News
  • Working with us
  • Contact
  • Home
  • Services
    • Construction Materials Testing
    • Geotechnical Engineering
    • Environmental Consulting
    • Subsurface Utility Engineering
  • Projects
    • NorthConnex Tunnel Fitout
    • PS2 Inland Rail Narrabri to North Star
    • New Parallel Runway (NPR)
    • Toowoomba Second Range Crossing
    • Sunshine Coast Airport Expansion
    • Bruce Highway Upgrade – CR2SM
    • South Flank Bulk Earthworks
    • Mackay Ring Road (Stage 1)
  • About Us
  • News
  • Working with us
  • Contact

Projects

Sand Backpass Pipeline Upgrade

Robina Footbridge Replacement

Coomera Springs Shade Structure

Western Outer Ring Main (WORM)

Mt Barker Pipeline

Mulgoa Road Corridor Upgrade (Stage 1)

Department of Defence - Solar Farms

 fragment  view  of the road under reconstruction

Deception Bay Road Interchange Upgrade

 Sunset Over Railway Tracks

NS2B - Inland Rail

Transmission Gully Motorway

 Sydney, Australia, City Highway Day, Evening Time

Mona Vale Road East Upgrade

 plane silhouette at sunset

Archerfield Airport

 Reclaimer spinning wheels machinery on mine site, Perth, Australia.

Cannington Buttress Tailings Facilities

 Busy Australian M1 highway at peak hour

Pacific Motorway

Weipa Amrun

 Aerial drone Photo of highway with cars. Road junction in a big city. Top view. Cityscape in the sunset soft light. Europe, Rome Italy.

Bruce Highway C2C

Haughton River Floodplain Upgrade

Pacific Highway W2B

Melbourne Metro Tunnel

Northern Road Upgrade Stage 4

Mackay Ring Road (Stage 1)

South Flank Bulk Earthworks

Bruce Highway Upgrade – CRSM

Sunshine Coast Airport Expansion

Toowoomba Second Range Crossing

New Parallel Runway (NPR)

PS2 Inland Rail Narrabri to North Star

North Connex Tunnel Fitout

Pacific Motorway (M1) Watland Street to Sports Drive Upgrade

Construction Sciences
  • Construction Materials Testing
  • Subsurface Utility Engineering
  • Geotechnical Engineering
  • Environmental Consulting
  • HSE Policy
  • Terms of Engagement
  • Modern Slavery Statement
  • Working with us
  • Current Opportunities
  • Training
  • Employee Benefits
  • About Us
  • Locations
ABN: 74 128 806 735 Head Office: 60 Kingsford Smith Drive, Albion, QLD, 4010 Phone: 1300 165 769

Partner Companies: Trilab | SureSearch | Geochempet | PPI Quality & Engineering | T2 Utility Engineers | Raba Kistner

web design by kmo  |  © Copyright 2022 Construction Sciences Pty Ltd.

Contact Us